GetNailedIt — Stages 1 & 2 Combined
Complete workflow for AI-based client presentation setup and structured communication.
FIRST STAGE – PROJECT SETUP & PROMPTING GUIDE
Purpose
This first stage defines your AI prompt framework and structure for preparing the client presentation. Use it to extract meeting notes, fix presentation layout, and generate the first HTML draft.
💡 Tip: Reference HTML layout:
📄 Download HTML Example (Dropbox)
📄 Download HTML Example (Dropbox)
Start Here
Master Prompt (Kickoff)
Reference Style (Clickable Link):
📄 HTML Example – Dropbox
Dear AI,
I want to make a detailed project presentation for a client including:
- Building cost estimates (in 3 tiers)
- Style commentary and qualitative design notes
- Resource / professional directory
- Construction timetable
Here is the style of the project (format to be copied exactly):
https://www.dropbox.com/scl/fi/rdevy1nmagp7ojlt0mebj/HTML-Example-to-use.docx?rlkey=5g996jc6raitkw9mvhlskb626&dl=0
Here are the notes and dialogue from the first client call:
[PASTE transcript or summary]
Uploaded are the architectural, structural, and MEP plans.
Please generate the **first draft** of the project presentation in the **exact HTML format** provided.
Pause after the first draft before making revisions.
Phased Prompts
Reusable Prompt Templates (Stage 1)
1) Meeting Analysis
Analyze the meeting transcript and produce:
- Concise summary (2–3 paragraphs)
- Topic breakdown + timestamps
- Key facts (location, goals, constraints)
- Next steps
Maintain a professional analytical tone.
2) Lock Style & Format
Here is the HTML layout I want for every presentation.
Do not alter structure or hierarchy.
Replicate exactly.
3) Integrate Plans
Summarize architectural, structural, and MEP plans.
Highlight design features and cost-impact elements.
4) Draft Generation
Generate the client presentation HTML with:
1. Concept & Intent
2. Cost Estimate (Basic–Premium–Luxe)
3. Directory
4. Timeline
5. Meeting Notes
5) Refinement
Refine layout to match reference, improve clarity and tone.
6) Final Polish
Polish for client delivery – flow, headings, labels, no data changes.
SECOND STAGE – COST, DIRECTORY & TIMELINE DEVELOPMENT
Purpose
This second stage refines Stage 1 outputs by integrating real vendor data, updated cost conversions, and a practical construction timeline. Values below use 1 USD = Rp 16 679 exchange rate (11 Nov 2025).